Wednesday, June 24, 2015

Summary of work from June 9th to June 22th

In the past two weeks I've finished my planned work before midterm. Here are the details:

To bring the GUI configuration of module EAS back to use, several things are done: the basic configuration and collection code for configuration, the EAS server auto-detect aspect, and some update to the deprecated usage of gtk+ in our project. Some steps are similar to the EWS module, so I borrowed some code from EWS.

Since I will have several final exams in the few weeks, the remaining part of my project will be covered a little bit later, maybe start at mid-July.

2 comments:

  1. Time is one of the most precious and expensive thing in this world so value your time wisely because you can't flashback every wasted time at the past. Time is gold. Visit my site for more information.

    triciajoy.com

    www.triciajoy.com

    ReplyDelete

  2. I accidentally viewed your blog and I was so amazed with your work that it touched the deepness of my heart and it made me sentimental. Thanks for posting. Visit my site too.

    n8fan.net

    www.n8fan.net

    ReplyDelete